Arrington, Plot 1 & 2 Project

One of our clients bought a building plot for a self-build house in Arrington, Cambridge. The planning permission for the project stipulated a 1m height reduction of the building, so we excavated and removed 2500 tonnes of soil from the site (equating to approximately 120 lorry loads). We undertook all the foundation work, services and drainage connections for the site and installed the foundations for the house and garage. We also installed retaining concrete, twin blockwork and rendered retaining walls, to retain the neighbours garden south of the plot and the upper terrace of the garden to the west of the plot and a large set of steps to the patio area of the house. The customer had chosen a prefabricated house, this was installed in 6 weeks by Dan Woods (the second biggest prefabricated house builder in Germany). Once they had built the house, we could then install all the landscaping and finishing to the site this consisted of paving and flower beds to the front and rear of the property. Alongside a large resin bound gravel driveway.

During the build. The neighbour who was also doing a self-build asked Summit to do the foundation work up to floor level, including block and beam and associated brickwork. The foundations were up to 4 meters deep on one side of the building. Due the ground level falling to one side and a hedge along the boundary.

Who We Have Worked With

Head Office
37 Catharine Street,
Cambridge,
Cambridgeshire
CB22 3TJ

Tel : 01223 782515
Email : info@groundworks-cambridge.co.uk

Summit Groundworks is a family-run company with over 20 years of experience in the building and construction industry. Our work is primarily located in and around Cambridge, Cambridgeshire, however our working radius is extended to home counties.

Excavation • Footings • Driveways • Tarmacing • Kerbing • Foundations • Trench & Ducting Work • Soakaways • Reinforced Concrete • Land Clearance • Land Drainage • Sewage Systems • Water Storage • Attenuation Tanks • Oil Separation • Permeable Systems • Hard and Soft Landscaping • Underpinning • Chemical Collection Tanks • Concrete Bases • Hard Standings • Crossovers • Civils & Utilities • Mechanical Pumping Equipment • Fencing • Tree Felling • Surfacing • Steel Fixings • Basements • De-Watering

Correspondence Address - Unit 12, Milton Enterprise Park, Oaks Drive, Newmarket, CB8 7YY 